I can't believe how much has happened since I gave the last update and how much is going to happen over the next couple of weeks. As of now, we are hopeful that we will be back into our kitchen by Easter weekend - which would be fantastic! But before we jump too far ahead, let me tell you/show you what has been going on.
There have been lots of design discussions. We still have to finalize countertops, backsplash, and paint color (along with a lot of other little details - faucet, sink, cabinet hardware, etc.) Here are some of the countertop options we considered:

The top left is by far our favorite look. It is a Virginia Mist granite which is the closest granite we have found to soapstone. We love the look of soapstone but are afraid of the maintenance issues we have read about. So, we tried to find a granite that was similar to soapstone in appearance. But, the actual samples that we found didn't quite look like we wanted them to and the price was a little on the high side, so we decided against this stone.
In the end we decided on the stone in the bottom center, although I should tell you the coloring is way off in this picture. Here is a better shot of the full slab.

These pictures don't quite get the coloring right either, but it is more cream than yellow, as it appears in the collage above.
Here is a picture of our final 3 choices on top of one of our cabinets.
The Virginia Mist is on the left and our final choice is on the right.

When we went back to the countertop store this weekend to look at the piece we had selected it was hidden behind another slab so they had to get out the tractor to move it for us. Carter didn't mind that one bit.

And here is a picture of our countertop sample, one of our cabinet doors, and a swatch of the paint we are considering for the walls.

So, that is where we are headed on the design front. I am hopeful our choices will create a warm but light and friendly kitchen that will flow well with the rest of our house. We will see...
Now on to the work that has been going on. Our contractor did a lot of work on the walls and electrical stuff last week. Then our refinisher pieced in some old hardwood planks to make that patch where the wall used to be disappear. Take a look - I think it turned out great.

Once everything is sanded down and stained the same color the patch should look seamless.
Our cabinets arrived last Thursday and were installed on Friday.



So that is where we stand right now. Here is a quick glimpse of the next couple of weeks (as long as everything stays on schedule.)
Mon/Tues - rebuild soffit, prep walls for backsplash
Tues - countertop template
Wed-Fri - floor refinishing
Next Tues - appliances delivered
Next Wed - countertops installed
Final Steps - backsplash installed, appliances/sink hook up, lights, final details
Sorry for all the pictures - hope at least a couple of you made it to the end!